Traffic is to be reduced to a single lane between Inver Bridge and Frosses from tomorrow.
Road improvement works are said to be progressing on the N56 Drumbeigh – Inver Road Scheme.
However, from tomorrow, motorists are advised to allow extra time for their journeys.
- Thu, 26 Dec 2024
- (+353) 07491 25000
- (+353) 086 60 25000